sitra causeway and interchange

Sitra Causeway and Interchange

sitra-causeway-interchange---after-(8).jpg

facts

Sitra Causeway and Interchange
Two road bridges, flyover and tunnel
Sitra, Bahrain
2005-2010

Completed 2010

Road bridges, lenght: 400 m / 200 m
Flyover lenght: 380 m

Client: Bahrain's road authorities
Architect: DISSING+WEITLING architecture
Engineer: COWI

Renderings: DISSING+WEITLING architecture

fakta

Sitra Causeway and Interchange
2 vejbroer, flyover og tunnel
Sitra, Bahrain
2005-2010

Udført 2010

Vejbroer, længde: 400 m / 200 m
Flyover, længde: 380 m

Bygherre: Bahrains vejdirektorat
Arkitekt: DISSING+WEITLING architecture
Ingeniør: COWI

Visualiseringer: DISSING+WEITLING architecture

Sitra Causeway and Interchange

DISSING+WEITLING architecture - in co‑operation with COWI - has designed a new motorway intersection which will substantially improve road safety and the infrastructure of one of Bahrain's busiest highways. The intersection includes two road bridges to the island of Sitra and Bahrain's first flyover, a three‑level motorway overpass.

 

Sitra Causeway and Interchange

DISSING+WEITLING architecture har sammen med COWI designet en ny vejbanesammenfletning, der medfører væsentlige trafiksikkerhedsmæssige og infrastrukturelle forbedringer for en af Bahrains mest belastede hovedtrafikårer. Sammenfletningen inkluderer to vejbroer til Sitra-øen samt Bahrains første 'flyover', en vejbanekrydsning i tre niveauer.